Orbital BIM Solutions
Coordinated MEP systems shown in a 3D model

MEP Systems That Coordinate Before They're Built

MEP systems fail on paper long before they fail on site - clashes between ductwork, conduit, and piping are far cheaper to catch in a model than in a finished ceiling cavity. We model each discipline to real fabrication tolerances, not simplified placeholders.

Our MEP modelers coordinate directly with architectural and structural teams throughout the process, so routing decisions account for ceiling heights, structural penetrations, and access requirements from the start.

What You Get

Fabrication-Level Accuracy

Models built to real equipment and material dimensions, ready to hand off for prefabrication.

Cross-Discipline Coordination

Routing decisions made with architectural and structural constraints already accounted for.

Fewer Site Surprises

Systems that fit as modeled, reducing costly rework during installation.

How We Work

  1. 1

    System Requirements Review

    We confirm equipment schedules, capacity requirements, and code constraints before modeling begins.

  2. 2

    Discipline Modeling

    Mechanical, electrical, and plumbing systems are modeled to fabrication-level detail.

  3. 3

    Coordination Passes

    Regular coordination reviews with other disciplines resolve conflicts before they reach the field.